Wind Farms
Wind Park MV Works
Wind farm MV (Medium Voltage) works cover the electrical infrastructure of a wind power plant (WPP) at medium voltage level. These works include:
MV Cable Laying and Connections: Laying and connecting MV cables going from the turbines to the transformer center.
MV Cubicles and Switchyard: Installation and connections of medium voltage cubicles (breakers, disconnectors, instrument transformers).
Grounding and Lightning Protection: Installation of grounding and lightning protection systems for the safe operation of the MV system.
Transformer Installation and Commissioning: Installation, testing and commissioning of MV/LV transformers.
SCADA and Remote Monitoring: Integration of SCADA system for remote monitoring and control of MV system.


Testing & Commissioning
The Testing and Commissioning process in wind parks is a critical stage to ensure the safe and efficient operation of the system. This process is carried out to verify that MV systems, transformer substations and other electrical components operate completely and without errors.
Preliminary Checks and Preparation
Electrical Tests
Commissioning Procedures
Final Checks and Acceptance Process
Electrification Scope Maintenance and Repair
In wind power plants (RES), maintenance and repair processes within the scope of electrification are of critical importance to ensure the safe, efficient and uninterrupted operation of the facility. Electrification maintenance works are generally considered in three main groups as preventive (periodic) maintenance, fault (corrective) maintenance and improvement works.
Periodic (Preventive) Maintenance
Malfunction (Corrective) Maintenance
Modernization and Improvement Works
Thermal Camera Inspections (To detect temperature abnormalities)
Insulation Resistance Tests (Megger Test)
Soil Resistance Measurements
MV Cable Tests (VLF, Tan-Delta, Partial Discharge Test)
Protection Relay Tests